Vladislava Valacha 17, 976 46 Valaská, Slovakia
+421 - 48 - 617 65 14, +421 - 903 800 618
babiak@dauba.sk

Ecology and environment

1. Preliminary assessment of the subject from the environmental perspective:

  • Initial inspection of the entity (its production facilities, areas, etc.)
  • Revision of compliance with the environmental legislation
  • Development of a draft for the necessary measures to remedy the gaps in the environmental protection

2. Assurance of the compliance with the legislation in the field of:

2.1. Waste management

  • Act 79/2015 on waste
  • Preparation of documents for issuance of consent pursuant to Act 79/2015 on Waste
  • Elaboration and keeping records on waste management
  • Developing of identification sheets on hazardous waste
  • Completing of a declaration on tenure and record keeping in case of possession of contaminated equipment containing polychlorinated biphenyls
  • Fulfilment of reporting obligations
  • Elaboration and keeping records on packaging and packaging waste
  • Fulfilment of reporting obligations regarding packaging and packaging waste

2.2. Water protection

  • As per Water Act 364/2004 and amendment to the Water Act 372/1990 on misdemeanour
  • Preparation of documents for issuance of approvals as per Act 364/2004 and amendment to the Water Act 372/1990 on misdemeanour
  • Preparation of the fee notice and return for the discharge of wastewater into surface waters
  • Elaboration of documents needed for approval of emergency plan
  • Preparation of the fee notice and return for groundwater sampling
  • Fulfilment of reporting obligations
Low Tatras

2.3. Air protection

  • Clean Air Act 137/2010
  • Preparation of documents for issuance of approvals as per Clean Air Act 137/2010
  • Inclusion of air pollution sources
  • Elaboration of documents for determining the amount of air pollution charges
  • Fulfilment of reporting obligations on sources, emissions and compliance with emission limits and emission quotas
  • Keeping operating records of sources and determining quantities of discharged pollutants

2.4. Environmental damage

European spruce bark beetle (Ips typhographus)

3. Elaboration of conceptual materials:

  • Waste Management Program (WMP) and delivery of documents needed to meet the objectives of WMP - Polychlorinated biphenyls holders program
  • Operating agenda of public sewerage system
  • Operating agenda of storage and handling of water polluting substances
  • Preventive measures for preventing uncontrollable leakage of hazardous substances - emergency plan
  • A set of technical and operational parameters and technical-organizational measures for sources of air pollution
  • Operating agenda of a system for recovery and disposal of waste
  • Inclusion of the entity as per Prevention of Major Industrial Accident Act 128/2015
  • Program of major industrial accidents prevention
  • Processing of applications for approvals under the Integrated Prevention and Environmental Pollution Control Act 39/2013
  • Initial Report as per Integrated Prevention and Environmental Pollution Control Act 39/2013
  • Elaboration of correspondence for the state authorities in the field of waste management, water and clean air protection and nature conservation
  • Representation of the entity at the public and state authorities (Ministry of Environment of the Slovak Republic, Slovak Environmental Inspectorate, district authorities, municipal office, etc.)
  • Implementation of legislative supervision

4. Processing of statistical data on waste, packaging, water and air

Mushrooms (Amanita muscaria)

5. Introduction of proposals for ensuring compliance with the legislation measures and meeting the conditions of individual state entities

6. Suggesting the measures for elimination of identified defects and delivering requirements and demands of the management.

7. Submitting proposals and suggestions if work by authorized personnel is needed (ensuring an appropriate method of collection, recovery or disposal, delivery of expertise, etc.)

8. Proving work by a qualified professional in the field of operation of public sewerages including wastewater treatment plant - as per § 5 paragraph 1 Act 442/2002 on public water supply and public sewerages and amendments 276/2001 on regulation in network industries.

9. Proving work by a qualified professional as per Act 24/2006 on Environmental Impact Assessment (EIA) and Strategic Environmental Assessment (SEA), assessing the impact of strategies, plans, programs, politics and concepts on the environment.

Attachment 1: Certificate 577/2012/OEP as of 13 April 2012 on professional competence for the purpose of assessing the impacts on environment as per § 61 paragraph 8 Act 24/2006 on Environmental Impact Assessment and as per § 1 Act 113/2006 on details concerning the professional competence for the purpose of assessing the environmental impact.

10. Providing professional consulting v in the field of integrated prevention and Integrated environmental pollution control as per Act 39/2013

Attachment 2: Certificate 13881/2014 z 28 February 2014 on professional competence for professional consulting in the field of integrated prevention and environmental pollution control issued by the Ministry of Environment of Slovak Republic as per § 31 paragraph 1 letter c) on Integrated Prevention and Environmental Pollution Control Act 39/2013 and its amendments; and § 2 paragraph 9 as per regulation by the Ministry of Environment of Slovak Republic 183/2013 implementing the Act 39/2013 on Integrated Prevention and Environmental Pollution Control.